Construction Inspection

PROJECT

NJDOT Stormwater Facilities Restoration

Various Locations | Bergen, Essex, Hudson, Morris, Passaic, Sussex, Union, and Warren Counties, NJ

Van Cleef provided inspection for the $9.7M 2025 Maintenance Stormwater Facilities Restoration Contract, North. Construction items and work included the replacement of CMP with 15” R.C.P, type B inlet structures, Outfall structures, implementation and maintenance and protection of Traffic, lane closures and signage, Solid Waste and Recyclable Disposal, Disposal of Regulated Material, Hazardous, and all repair categories. Work conducted on site included moving existing fiber optic lines & NJDOT communication/electric lines, removing existing curbs, removing existing asphalt, placing/pinning jersey barrier for our permanent shoulder closure, removing existing NJDOT exit signs, site and tree clearing, installing soil erosion and sediment control measures and restoration of topsoil.

CLIENT CONTACT

                 NJDOT Region North                    Mount Arlington, NJ 

PROJECT HIGHLIGHTS

  • Replacement of 15” CMP with 15” RCP
  • Type B Inlet Structure Reconstruction
  • Concrete Vertical Curb Removal & Installation
  • ¾” Clean Stone and Dense Graded Aggregate Installation
  • Lane Closures & Traffic Safety Control
  • Disposal of Regulated Material
  • Top Soil, Soil Erosion Control Mats